Dojo · Finding · Then and now · as of
Tesla Dojo supercomputer: then vs now
Proposition (held fixed): Would Tesla’s own Dojo training supercomputer become world-class, and when would Dojo 1 and Dojo 2 be online at volume? This page tracks dated Elon wording on Dojo. It is not a chip-benchmark page.
From a custom training computer aiming to be the best in the world, to one chip roadmap where “all paths converged to AI6”.
“Dojo uses our own chips & a computer architecture optimized for neural net training, not a GPU cluster. Could be wrong, but I think it will be best in world.”
“And then, we also had the Dojo program, which was doing it was also doing okay, but but not on a path to be competitive with Nvidia. So, I I collapsed the I collapsed the two programs into just one program just to get everyone focused on AI 5 chip, which is essential.”
Sep 2024: “we should have Dojo 2 in volume towards the end of next year” 9 Sep 2024 · All-In Summit 2024 · 45:45
Jun 2025: “Dojo 2 is good, but Dojo 3 will be great.” 5 Jun 2025 · X post
Aug 2025: “Once it became clear that all paths converged to AI6, I had to shut down Dojo and make some tough personnel choices, as Dojo 2 was now an evolutionary dead end. Dojo 3 arguably lives on in the form of a large number of AI6 SoCs on a single board.” 10 Aug 2025 · X reply
ElonsFAQ corpus · verified 2026-10-23 · unofficial.
Dojo: from “best in world” to one chip roadmap built on AI5 and AI6
Aug 2020: V1.0 in about a year → Sep 2020: “best in world” → Aug 2021: operational next year → Jul 2024: double down, ~8k H100-eq by year end → Sep 2024: Dojo 2 in volume end of 2025 → Jun 2025: Dojo 2 later this year, Dojo 3 will be great → Aug 2025: shut down, Dojo 2 a dead end → Nov 2025: collapsed into AI5.
- claim with a date
- restated / revised
- observed status
- 15 Aug 2020X reply“Dojo is still being built. Maybe a year or so from V1.0.”Target: 2021 · V1.0
- 20 Sep 2020X reply“Could be wrong, but I think it will be best in world.”Target: best in world
- 19 Aug 2021Tesla AI Day 2021 · 2:16:21“So we should have Dojo operational next year”Target: 2022 · operational
- 13 Aug 2022X reply“We’ll phase in Dojo. Won’t need to buy as many incremental GPUs next year.”Target: 2023 · phase in
- 23 Jul 2023X reply“Dojo is arguably the biggest computer architecture overhaul since Cray.”Target: architecture overhaul
- 23 Jul 2024X reply“And Dojo 1 will have roughly 8k H100-equivalent of training online by end of year. … we are going to double down on Dojo”Target: end of 2024 · ~8k H100-eq
- 9 Sep 2024All-In Summit 2024 · 45:45“we should have Dojo 2 in volume towards the end of next year”Target: end of 2025 · Dojo 2 volume
- 20 Mar 2025Tesla All-Hands (Q1 2025) · 25:16“So we've got Dojo 1 active now in Gigafactory New York and in Palo Alto. … Dojo 2 that's coming down the line that'll be probably 10 times better”Target: Dojo 1 active · Dojo 2 10×
- 5 Jun 2025X post“We start bringing Dojo 2 online later this year. … Dojo 2 is good, but Dojo 3 will be great.”Target: later 2025 · Dojo 2
- 10 Aug 2025X reply“I had to shut down Dojo … as Dojo 2 was now an evolutionary dead end.”Target: status: shut down
- 14 Nov 2025Baron Investment Conference 2025 · 47:30“not on a path to be competitive with Nvidia. … I collapsed the two programs into just one program”Target: status: collapsed into AI5
Then
15 August 2020, on X:
“Dojo is still being built. Maybe a year or so from V1.0.”
20 September 2020, on X:
“Dojo uses our own chips & a computer architecture optimized for neural net training, not a GPU cluster. Could be wrong, but I think it will be best in world.”
19 August 2021, Tesla AI Day:
“So we should have Dojo operational next year”
Editorial calendar reading: “next year” from Aug 2021 = 2022.
13 August 2022, on X:
“We’ll phase in Dojo. Won’t need to buy as many incremental GPUs next year.”
23 July 2023, on X:
“Dojo is arguably the biggest computer architecture overhaul since Cray. Doesn’t mean it succeeds, but it doesn’t lack for boldness.”
23 July 2024, on X and on the Tesla Q2 2024 earnings call:
“And Dojo 1 will have roughly 8k H100-equivalent of training online by end of year. Not massive, but not trivial either.”
“So we are going to double down on Dojo and we do see a path to being competitive with Nvidia with, with Dojo.”
9 September 2024, All-In Summit:
“we should have Dojo 2 in volume towards the end of next year”
Editorial calendar reading: “the end of next year” from Sep 2024 = end of 2025.
20 March 2025, Tesla all-hands:
“So we've got Dojo 1 active now in Gigafactory New York and in Palo Alto.”
“And then we've got Dojo 2 that's coming down the line that'll be probably 10 times better than Dojo 1.”
5 June 2025, on X:
“Tesla Dojo AI training computer making progress. We start bringing Dojo 2 online later this year. It takes three major iterations for a new technology to be great. Dojo 2 is good, but Dojo 3 will be great.”
Now
10 August 2025, on X:
“Once it became clear that all paths converged to AI6, I had to shut down Dojo and make some tough personnel choices, as Dojo 2 was now an evolutionary dead end. Dojo 3 arguably lives on in the form of a large number of AI6 SoCs on a single board.”
14 November 2025, Baron Investment Conference, looking back at the chip programs:
“And then, we also had the Dojo program, which was doing it was also doing okay, but but not on a path to be competitive with Nvidia. So, I I collapsed the I collapsed the two programs into just one program just to get everyone focused on AI 5 chip, which is essential.”
What changed
| Item | Then (2020–mid 2025) | Now (from 10 Aug 2025) |
|---|---|---|
| Status | custom training computer, Dojo 1 online, Dojo 2 “later this year” / in volume end of 2025 | shut down; Dojo 2 called an evolutionary dead end |
| Ambition | “best in world”; competitive with Nvidia; Dojo 3 “will be great” | collapsed onto AI5 inference silicon; Dojo 3 “arguably lives on” as AI6 SoCs on a board |
| Why | own chips so Tesla would not have to buy as many incremental GPUs | “all paths converged to AI6” |
What did not change
- The problem: Tesla still needs training and inference compute, and still designs its own chips.
- The three-iteration rule: Elon had already said a technology takes three major iterations to be great, including for Dojo.
Neutral conclusion
From 2020 through June 2025 Elon described Dojo as Tesla’s own training supercomputer: maybe a year from V1.0, possibly best in the world, operational the next year, then Dojo 1 on the order of 8,000 H100-equivalents by the end of 2024, with Dojo 2 in volume toward the end of 2025 and Dojo 3 to follow. On 10 August 2025 he wrote that he had shut Dojo down because Dojo 2 was an evolutionary dead end once paths converged on AI6. In November 2025 he said the Dojo program had not been on a path to compete with Nvidia and that he had collapsed the two chip programs onto AI5. This compares dated wording; it makes no claim about motives or whether AI6 replaced the same workload.
Scope
- Indexed ElonsFAQ corpus (transcripts and X posts); not every Elon Musk interview.
- YouTube wording is from automatic captions (ASR); fillers such as “uh” are kept as spoken.
- Calendar readings of relative dates (next year, this year) use the statement date.
- Parent verifies X posts word for word.